While in most cases, replacing a component is not the best option. It may be the only viable one if your typical maintenance cycles are no longer effective. Or you notice other small issues within the turbine. Knowing what to expect when fixing a combined cycle turbine will save you money. Also, it makes your repairs smoother and faster. 

As with any machine, the first step in maintaining a combined cycle turbine is to identify the issue. Depending on the component, the issue may manifest itself as general wear and tear or an actual dysfunction.

Once you have determined the issue, it’s important to determine which part is causing the malfunction. Knowing what needs to be replaced and where to find it can save time and money. 

Finally, once you have identified the replacement parts and installed them, it’s important to follow the manufacturer’s instructions for proper maintenance and testing. Doing so will ensure that your turbine continues production at its best possible level.

What is a Combined Cycle Turbine?

Combined cycle turbines (CCTs) combine the best features of gas turbines and steam turbines to create more efficient machines. The technology can improve energy efficiency by as much as 30 percent, while also reducing pollution. Combined cycle turbines are used in a variety of industries, including electricity generation, desalination, and industrial cleaning.

Types of Combined Cycle Turbines

There are a number of different types of combined cycle turbines. The main types are the direct-drive, gearbox, and water turbine machines.

Direct-drive turbines use an electric motor to drive the shaft, with the generator connected to the rotor side of the engine. Gearboxes are usually used because they allow for more flexibility in terms of speed and torque, which can benefit overall efficiency. Water turbines work best when there’s a large river or lake.

Maintenance of a Combined Cycle Turbine

A combined cycle turbine is an extremely efficient and clean energy source that utilizes the Brayton cycle. This type of turbine typically has five main components: an air inlet, an air outlet, a compressor, a turbine, and a reverser. Together these parts work together to produce mechanical energy that can be used to power an engine or electrical generator. The most important part of maintaining a CCT is inspecting and replacing the parts as needed so that it continues to operate efficiently.

Inspecting the Compressor

The compressor is most important part of a CCT because it helps to increase the airflow into the turbine. It should be checked regularly for wear and damage. And,  if,  needed replaced or repaired. If there is excessive wear or damage, it may need to be rebuilt from scratch.

Inspecting the Air Outlet

The air outlet should also be inspected regularly for wear and damage. If it begins to show signs of deterioration, such as leaks or rusting, it may need to be replaced. Additionally, if there is any blockage in the airflow due to debris or dust.

Replacing Parts on a CCT

When replacement parts are necessary on a CCT, they can usually be purchased from manufacturers or retailers who specialize in this type of machinery. In some cases though, specific replacement parts may not exist and must instead be fabricated

Repair of a Combined Cycle Turbine

Main components of a combined cycle turbine comprise the stator, rotor and abatement equipment. The stator consists of a number of windings connected to a power supply. The rotor is made up of a number of blades that are rotated by the wind to produce electricity. The abatement equipment takes the dirty exhaust gasses from the turbine and clears them before they can release pollutants into the atmosphere.

Installation and Disassembly of a Combined Cycle Steam Turbine

Installation and disassembly of a combined cycle steam turbine is a relatively straightforward undertaking that can be completed in a relatively short period of time. The major components of a combined cycle steam turbine include the boiler, the steam turbine, and the condenser. 

The boiler is responsible for heating water to a high enough temperature to create steam, which in turn powers the turbine. To install a combined cycle steam turbine, it is necessary to first install the boiler on site. The boiler typically consists of four main parts: the firebox, the casing, the welded plates, and the flue gas passage. 

To install the boiler, first locate it on site and survey its dimensions. Once located, mark out its boundaries with stakes or chalk lines so that workers will know where to drill holes prior to welding. Next, remove any combustible materials near the perimeter of the boiler using an incinerator or flame-thrower. Next, drill holes in the ground around the perimeter of the boiler using an auger drilling machine and then pour in concrete while ensuring that all edges of the hole are smooth. Once all preparations have been made, weld together all four main parts of the boiler – firebox, casing, welded plates, and flue gas passage – using 75% iron and 25% steel (or equivalent). 

 